Please reload

Follow Us

We are excited to announce that the first cabin door in!  Door handles arriving next week. Please check back on our blog frequently for updates. 

 Greetings GSSGC,

We are excited to share the photos above on Skyland progress. As of now the photos reflect the following:  

  • Main Restroom – plumbing progress

  • Directional Signs – the signs need a bit of fine tuning (adjusting for level/parallel) and old si...

Inspections by the County of Riverside continue to be approved. Siding has begun.

It’s been a busy week of work on the Wishaven cabins so far this week:

                Accessible parking place and walkway from biffy to cabin 1 was poured and finished

                All windows hav...

* Work on Wishaven cabins and sleeping porch.

* Progress on shear panel, 80% completed.

* Panel, inverters and switch gear installed. 

Although Mother-Nature slowed progress a bit, we are back to work this week on the beautiful Skyland Ranch Camp. Please see pictures below for updates. 

Some of the walkways have been poured.  Inspection on floor plumbing early next week.  More concrete next week.  Roof framing to start next week.

Work continues on Skyland Ranch Camp. Wall grout, filling the walls with concrete will occur Monday before the snow flies. We are excited about the progress. 

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Search By Tags
Archive
Please reload

  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Icon
  • snachaticon
  • Flickr Social Icon

1751 Plum Lane 

Redlands, Ca 92374 

(909) 307-6555