Inspections by the County of Riverside continue to be approved. Siding has begun.

It’s been a busy week of work on the Wishaven cabins so far this week:

                Accessible parking place and walkway from biffy to cabin 1 was poured and finished

                All windows hav...

* Work on Wishaven cabins and sleeping porch.

* Progress on shear panel, 80% completed.

* Panel, inverters and switch gear installed. 

Although Mother-Nature slowed progress a bit, we are back to work this week on the beautiful Skyland Ranch Camp. Please see pictures below for updates. 

Some of the walkways have been poured.  Inspection on floor plumbing early next week.  More concrete next week.  Roof framing to start next week.

Work continues on Skyland Ranch Camp. Wall grout, filling the walls with concrete will occur Monday before the snow flies. We are excited about the progress. 

We are excited to share that more progress has been made in the main restroom. Pad has been graded and certified, footings have been dug in preparation of foundation/slab pour, and rough underground plumbing pipe has been installed and is ready for inspection. 

We are making great progress with our main restroom. Our team has been working around the clock to ensure we are meeting deadlines to complete this project. Please see the pictures below. 

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Search By Tags
Archive
Please reload

  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Icon
  • snachaticon
  • Flickr Social Icon

1751 Plum Lane 

Redlands, Ca 92374 

(909) 307-6555