Work continues on Duncan Lodge!  Framing was inspected and signed off yesterday.  Electrical and plumbing continue on the interior.  Insulation, shear panel and siding are up next on the exterior.  Roof insulation and the metal roof should be in place within the next few weeks.  Note the new structural metal posts on either side of the fireplace on the west end of the dining room.  The windows and doors have been ordered.  Mechanical (hvac) will be out next week to cut their penetrations through the roof for the kitchen hood.