Duncan Lodge Update – October 2017

 

 

Work continues on Duncan Lodge!  Framing was inspected and signed off yesterday.  Electrical and plumbing continue on the interior.  Insulation, shear panel and siding are up next on the exterior.  Roof insulation and the metal roof should be in place within the next few weeks.  Note the new structural metal posts on either side of the fireplace on the west end of the dining room.  The windows and doors have been ordered.  Mechanical (hvac) will be out next week to cut their penetrations through the roof for the kitchen hood.

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Icon
  • snachaticon
  • Flickr Social Icon

1751 Plum Lane 

Redlands, Ca 92374 

(909) 307-6555