July 2020 Progress

 Greetings GSSGC,

 

We are excited to share the photos above on Skyland progress. As of now the photos reflect the following:  

  • Main Restroom – plumbing progress

  • Directional Signs – the signs need a bit of fine tuning (adjusting for level/parallel) and old signage removed and saved for display

 

Work continues on:

  • Wishaven Cabins – electrical is completed and the doors should be in next week.  I will provide pictures when everything is completed.

  • Sleeping Cabins – gable end panels have been installed, metal flashing on the top of the walls are partially installed.  Looking toward final painting at the end of next week.

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram Icon
  • snachaticon
  • Flickr Social Icon

1751 Plum Lane 

Redlands, Ca 92374 

(909) 307-6555